E N G I N E
3-5
ENGINE
REMOUNTING
The engine can be mounted in the reverse order of removal.
Engine mounting nut
: 33-39 N•m
Engine lower hanging nut
: 22-33 N•m
Swing arm nut
:50-80 N•m
Muffler bolt
:11-15 N•m
Install the drive chain and drive chain clip
.
Align the release arm slit surface with the notch mark on the
release cam shaft.
B
A
C
D
D
Notch mark
Slit
:
NOTE
The engine mounting nuts are self-lock nuts. Once the nut
has been removed, it is no longer of any use. Be sure to
use new nuts and tighten them to the specified torque.
Temporarily
fasten the engine mounting bracket before
inserting the engine mounting bolts.
Tightening torque for engine mounting bolts:
1
After installing the engine, pour the engine oil into the
engine. (Refer to page 2-7)
Inspect the oil level. (Refer to page 2-7)
Inspect the throttle cable (page 2-9)
Inspect the clutch cable
(page 2-8)
Inspect the idling speed
(page 2-8)
Inspect the drive chain
(page 2-10)
Summary of Contents for GN125F
Page 1: ...GN125F 99500H3030DE001...
Page 28: ...PERIODIC MAINTENANCE 2 16...
Page 70: ...FUEL AND LUBRICATION CONTENTS FUEL COCK CARBURETOR LUBRICATION SYSTEM 4 1 4 3 4 7 4...
Page 144: ...WIRE ROUTING SERVICING INFORMATION 7 16...
Page 145: ...SERVICING INFORMATION 7 17...
Page 148: ...SUZUKI MOTOR CORPORATION JIANGMEN DACHANGJIANG GROUP CO LTD...