C H A S S I S
5-32
Inspect the bushing for wear and damage.
Using a dial gauge
check the pivot shaft for runout and
replace it if the runout exceeds the limit.
,
INSPECTION
BUSHING
SWING ARM PIVOT SHAFT
09900-20606: Dial gauge (1/100)
09900-20701: Magnetic stand
09900-21304: V block
-
Pivot shaft runout limit: 0.6 mm
REASSEMBLY
Reassemble and remount the swing arm in the reverse order
of disassembly and removal, and also carry out the following
steps:
Force-fit the bushings into the swing arm by using the
special tool.
Apply grease to the spacer and dust seal cover when
installing
Insert the swing arm pivot shaft from the left side, and
tighten the pivot shaft nut to specified torque.
Tighten the rear absorber nut to the specified torque.
.
09924-84521: Bearing installer set
Rear pivot shaft nut: 50~80 N•m
Rear absorber nut: 22~35 N•m
99000-25010 Super grease ”A”
:
Summary of Contents for GN125F
Page 1: ...GN125F 99500H3030DE001...
Page 28: ...PERIODIC MAINTENANCE 2 16...
Page 70: ...FUEL AND LUBRICATION CONTENTS FUEL COCK CARBURETOR LUBRICATION SYSTEM 4 1 4 3 4 7 4...
Page 144: ...WIRE ROUTING SERVICING INFORMATION 7 16...
Page 145: ...SERVICING INFORMATION 7 17...
Page 148: ...SUZUKI MOTOR CORPORATION JIANGMEN DACHANGJIANG GROUP CO LTD...