5C-18 Clutch:
8) Put the clutch pressure plate onto the clutch sleeve
hub securely.
9) Put the clutch diaphragm spring seat (11) and clutch
diaphragm springs (12) onto the clutch pressure
plate properly.
NOTE
Pay attention to the direction of the clutch
diaphragm springs. Refer to “Clutch
Assembly Diagram: ”.
10) Install the diaphragm spring holder (13) with the
screws.
11) Install the lock washer (14).
12) Tighten the clutch sleeve hub nut to the specified
torque by using the torque wrench and clutch
pressure plate holder.
Special tool
(A): 09920–34820 (Clutch pressure plate
holder)
Tightening torque
Clutch sleeve hub nut: 150 N·m (15.0 kgf-m,
108.5 lb-ft)
13) Lock the clutch sleeve hub nut with a center punch.
14) Insert the clutch push rod (15) into the countershaft.
15) Install the clutch push piece (16), bearing (17) and
thrust washer (18) to the countershaft.
Driven plate
Thickness
No.1
1.6 mm (0.06 in)
No.2
2 mm (0.08 in)
I649G1530046-01
12
11
I649G1530047-03
13
14
I649G1530048-02
(A)
I649G1530049-01
I649G1530050-01
15
16
17
18
I649G1530051-02
Summary of Contents for 1200 bandit
Page 1: ...9 9 5 0 0 3 9 2 8 0 0 1 E GSF1200 GSF1200S ...
Page 4: ......
Page 89: ...Engine Mechanical 1D 21 B I649G1140073 02 C I649G1140074 02 24th pin 1st pin I649G1140075 03 ...
Page 288: ...2D 20 Wheels and Tires ...
Page 446: ...Prepared by December 2005 Part No 99500 39280 01E Printed in Japan 448 ...
Page 447: ...Printed in Japan K6 ...