1J-9 Charging System:
• Apply a small quantity of THREAD LOCK “1342” to
the bearing retainer screws and tighten them to the
specified torque.
: Thread lock cement 99000–32050 (Thread
Lock Cement 1342 or equivalent)
Tightening torque
Bearing retainer screw (a): 2.5 N·m (0.25 kgf-m,
1.8 lb-ft)
• Install the bearing and rotor using a hand-press “A”.
NOTE
Before reinstalling the slip ring side bearing
onto the generator end housing, turn the
expander ring and align the expander ring lug
“C” with the center of the chamfered edge
“D” of the bearing outer race.
• Tighten the generator housing nuts (7) to the specified
torque.
Tightening torque
Generator housing nut (b): 4.5 N·m (0.45 kgf-m,
3.25 lb-ft)
“A”: Hand-press
“B”: Jig
“A”: Hand-press
1. Bearing
“B”: jig
2. Rotor
(a)
(a)
I649G11A0023-02
“B”
“A”
I649G11A0024-02
“B”
2
“A”
1
I649G11A0025-02
2. Rotor
5. Bearing cover #1
3. Bearing cover #2
6. Expander ring
4. Slip ring side bearing
“B”: Jig
“C”
“D”
I649G11A0026-02
3
“B”
2
4
5
6
I649G11A0027-02
Summary of Contents for 1200 bandit
Page 1: ...9 9 5 0 0 3 9 2 8 0 0 1 E GSF1200 GSF1200S ...
Page 4: ......
Page 89: ...Engine Mechanical 1D 21 B I649G1140073 02 C I649G1140074 02 24th pin 1st pin I649G1140075 03 ...
Page 288: ...2D 20 Wheels and Tires ...
Page 446: ...Prepared by December 2005 Part No 99500 39280 01E Printed in Japan 448 ...
Page 447: ...Printed in Japan K6 ...