![Strebel S-CBX 105 Installation Operating & Maintenance Manual Download Page 109](http://html.mh-extra.com/html/strebel/s-cbx-105/s-cbx-105_installation-operating-and-maintenance-manual_1384114109.webp)
109
Orifice
Gasket
Sticker
Installing the orifice (see also picture below):
Needed tools: wrench 55 or pipe wrench, Hex key 5 mm and Hex key 4 mm
1. Close the external gas shutoff valve and disconnect the electrical power before opening the boiler.
2. Use a wrench to open the coupling in the gas line in the boiler. The three screws, with which the venturi is
mounted onto the fan, can now be removed.
3. Venturi and gas combination valve can now be separated. The orifice is to be placed between venturi and gas
combination valve. The rounded side of the orifice must be on the side of the gas combination valve.
The orifice must be mounted into the gas access of the venturi and secured with the rubber gasket.
4. Venturi and gas combination valve now can be reconnected.
5. Remount the gas combination valve and the venturi onto the fan. Close the coupling in the internal gas line.
6. The external gas valve can now be opened.
7. Check for gas leaks.
8. Reconnect the electrical power.
9. If in operation, check again for gas leaks.
Summary of Contents for S-CBX 105
Page 2: ......
Page 40: ...40 9 10 Flue Terminal Positioning ...
Page 42: ...42 9 11 1 FIGURE 12 LINE G ...
Page 55: ...55 11 5 Ladder Logic Diagram ...
Page 56: ...56 11 6 Electrical schematics ...
Page 57: ...57 ...
Page 137: ......