
Instruction Manual for Sicurao pesa Hospital Bed
Page
60
Inspection Report following an inspection of electromedical equipment
according to DIN EN 62353 (VDE 0751-1): 2015-10 - Page 2 of 2
III.
Performance Check
Ok Not
Ok
Description of
Defect
Performance Inspection of the Electrical Components (if installed)
Emergency operation using
batteries; battery capacity; to
check: connect bed to mains
supply for 24 h, then run test.
Minimum of 3 height adjustment
cycles with a load of approx. 80
kg on the bed.
End of travel cut-out for motors Automatic cut-out
(not necessary
when moving the ba leg rest, due
to functional design; reason: friction
clutch/providing protection against
trapping)
Handset, foot pedal; operating
elements, locking functions
Test according to instruction
manual
No "rattling" when shaken
Motors
Abnormal noise level Emergency
release backrest motor
Control unit/transformer and
motors
Test according to instruction
manual
Strain relief of mains cable
Mains cable firmly fastened
Performance Inspection of the Mechanical Components (if installed)
Joints and pivots
Smooth operation
Gas springs (backrest, mattress
base tilting)
Sufficient
supporting
force;
reliable locking
Height
adjustment
using
hydraulic pump /foot pedal
Sufficient lifting force
Lower leg rest (Rastomat)
Engage
Grab handle with strap
Secure position
Castors
Brakes, securely engaged brake
safety sides
Locking in place, release
Accessories (e.g. patient lifting
pole, grab handle)
Fixing, damage, suitability
Overall Inspection Result:
Defects/remarks:
No safety or functional defects were detected
No direct risk, the defects detected can be rectified quickly
Appliance must be taken out of circulation until the defects have been rectified!
Appliance does not conform to requirements – modification/replacement of
components/decommissioning recommended.
Test approval sticker applied:
yes
no
Next inspection date:
Documents that form part of this inspection report:
Checked
Date:
Name:
Signature:
Test approval
sticker
applied:
Date:
Name:
Signature:
Address/stamp of responsible company.