Inspection Report following an inspection of electromedical equipment according to
DIN EN 62353 (VDE 0751-1): 10/2015 - Page 1 of 2
Customer / med. facility / practice:
Address:
Carried out:
Repeat inspection
Inspection prior to initial operation(reference value)
Inspection following repairs/servicing
Equipment type:
Hospital bed
Care bed
Protection class:
I
II
Bed type:
Sicuro pesa
Inventory number:
Location:
Serial number:
Manufacturer:
Stiegelmeyer GmbH & Co. KG
User-specific parts:
None
Testing equipment used (type/inventory no.):
1.
MP-RL 93/42 Classification:
Class I, Type B
2.
I. Visual inspection
What to check…
Check for…
Ok
Not
Ok
Description of
Defect
Visual Inspection of the Electrical Components (if installed)
Stickers and type plates
Present, legible
Control unit/transformer housing Correct position, damage
Motor housing and lifting tubes Correct position, damage
Handset/foot pedal
No damage
Motor cable, handset cable,
mains cable
Damage, routing
Mains cable holder
Fixed position
Plug and plug cover on control
unit
Available, correct position
Visual Inspection of the Mechanical Components (if installed)
Stickers and type plates
Present, legible
Patient lifting pole, location
sleeves
Grab handle with strap
Damage, deformation
Chassis
Damage, deformation
Castors
No damage
Mattress base
No damage
Welded seams
Split welded seams
Gas springs, dampers,
hydraulics
No damage, sealing
Safety sides
No damage, deformation
Connecting elements (screws,
bolts, nuts, safety caps)
Fixed position, completeness
Wearing parts, joints
No damage, severe wear
II.
Electrical Measurement according to DIN EN 62353 (VDE 07051-1): 2008-08:
Threshold
Measured
value
Resistance of earth wire.
Measuring point: PE
pin on the bed, head end. Measuring current ≥2 A
0.3
Leakage current of the device
, DC/Diff.
(place bed with conductive castors in a way that it
is insulated).
1.
Plug the bed mains cable in the test socket on
the measuring instrument.
2.
Connect the measuring instrument probe to the
PE connector (mattress base, head end).
3.
Activate the motors using the handset for the
duration of the measurement.
0.5 mA
mA
X
X