Skate RaiLReplacement··
•
NOTE: Remove and
instafl ONL
Y
ONE
skate rail at
a
time.
Tools Required:
Phillips head screwdriver
7/16-in. socket wrench
1/2-in. socket wren
1/2-in. open-end wrench
3/16-in. Allen wrench
5/32-in. Allen wrench
1/8-in. Allen wrench
Needle nose pliers
Remove the front shroud:
1.
Using Phillips head screwdriver, remove the eight Phillips head screws from the front
shroud.
2.
Lift the front shroud off the unit.
Remove the rear shroud:
1.
Using Phillips head screwdriver, remove the eight Phillips head screws from the rear
shroud.
2.
Lift the rear shroud off the unit.
Remove the skate rail:
1.
Slide the shuttle completely forward on the skate rail.
2.
Using 3/16-in. hex head socket wrench, remove the four screws (from underneath the
shuttle) securing the footpad. to the shuttle. Remove the footpad.
3.
Using 3/16-in. hex head socket wrench, remove the four screws (at the rear of the shut-
tle) securing the shuttle to the capture plates.
4.
Using needle nose pliers, CAREFULLY pull the section of the stride belt containing the
capture plates out through the access hole in the side of the skate rail.
5.
Using 1/8-in. Allen wrench, remove the three Allen screws from the top capture plate, and
separate the capture plates from the stride belt.
See Diagram K.
Elliptical Edge Service Manual
Diag. K
5.15
Summary of Contents for Elliptical Edge
Page 8: ......
Page 14: ......
Page 26: ......
Page 28: ......
Page 59: ...Page 1a ET FRAME ASSY ell...
Page 61: ...Page 2a ELECTRICAL KIT ET w o z...
Page 63: ...Page3a SHROUD KIT ET...
Page 65: ...Page 4a CRANK ASSY ET...
Page 67: ...Page Sa Transmission Assy ET...
Page 69: ...Page 6a EEDIS YKIT...
Page 71: ...Page Sa RAIL ASSEMBLY KIT...
Page 74: ......