May 1, 2014
3
922-112 BUBBLE WINDOW
INSTALLATION INSTRUCTION
SPECIFICATIONS
Paint
–
Electrostatically applied & oven cured powder coat
Hardware
–
Stainless steel & tamper resistant
Tube –
FloCoat® Galvanized 1 3/8” O.D. and 1” O.D.
Bubble Window-
Roto-Molded Plastic.
SPECIAL SAFETY & ASTM COMPLIANCE NOTES
CRITICAL MEASUREMENT
IT IS EXTREMILY
IMPORTANT THAT YOU MAINTAIN A MAXIMUM
OF 3 1/2” DISTANCE BETWEEN THE BOTTOM, OR
SIDES OF THE BUBBLE WINDOW AND THE
NEAREST EDGE OF THE DECK OR POSTS.
INSTALLATION TIPS & TROUBLE SHOOTING
SportsPlay Equipment Inc. recommends pre-drilling the
holes in the post when attaching a four-hole bracket with a
number #7 drill bit. This will make the attachment of the
four-hole bracket with the self-tapping screws easier and it
will prevent damage to the screw head during installation.
Apply locktite to all bolts during assembly prior to
completely tightening them.
Stainless Steel hardware can occasionally be difficult to use
particularly if you need to take them out to make an
adjustment. It is recommended that you add a drop of oil to
bolts that may have to be removed before you install them.
Do not tighten bolts all the way until the unit is completely
assembled and all components are square and level.
Identify and separate all parts by referencing the detail
drawings and the parts list.
As you unpack and separate the components, use the
cardboard sheets that were used for packing and shipping to
prevent damage to the components. This is particularly true
all Powder Coated and Thermoplastic coated components,
by setting the components on top of the cardboard.
Summary of Contents for Quick Ship 3 Modified
Page 1: ... 012 3 4 5 2 6 7 8 9 8 6 0 5 4 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...QUICK SHIP 3 MODIFIED Installation Guide ...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 29: ......
Page 31: ......
Page 34: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Page 41: ...March 13 2014 4 922 135 3 TRANSFER STATION INSTALLATION INSTRUCTION ...
Page 51: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION ...
Page 59: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION ...
Page 75: ...February 17 2010 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION ...
Page 104: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Page 105: ......
Page 111: ......