March 11, 2014
7
922-120-3 CORKSCREW 3’ DECK
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__5)
Connect four hole brackets to posts:
Now you need to
install the Four Hole Brackets to the posts. The top of the barrier,
NOT THE ARCH, should be 38” from the surface of the deck to
the top of the barrier. Once you have the top of the barrier at the
correct height tighten the two 3/8” x 1” Button Head bolts (6). The
Four-Hole Brackets get installed with the Self-Tapping Screws (4)
and Attachment Bracket Gaskets (5) make sure that the hole for the
3/8x 3/8” set screw is pointing down.
TIP: It’s easier to install
the self-tapping screws if you pre drill the holes in the post with
a #7 drill bit by marking the hole locations with a dry erase
marker after you have put the guard wall into position.
Install
the Self-Tapping Screws into the holes you have drilled in the posts
with the Attachment Bracket Gasket between the post and Four
Hole Attachment Bracket. (See detail B)
__6)
Secure the Arch Wall to the Attachment Bracket:
Install
and tighten the
3/8” x 3/8” Set Screw (5) in the Four -Hole Bracket.
(See detail B)
__7)
Dig footing hole:
Referencing the footing cutaway drawings
on page 3, the footing layout and elevation views on page 4 of this
components instruction set along with the main footing diagram on
page 5 of the installation guide, mark and dig the footings as
instructed for the corkscrew Climber (1). (Footing depth is 24” less
the amount of surfacing used plus the thickness of the blocking
material).
Summary of Contents for Quick Ship 3 Modified
Page 1: ... 012 3 4 5 2 6 7 8 9 8 6 0 5 4 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...QUICK SHIP 3 MODIFIED Installation Guide ...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 29: ......
Page 31: ......
Page 34: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Page 41: ...March 13 2014 4 922 135 3 TRANSFER STATION INSTALLATION INSTRUCTION ...
Page 51: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION ...
Page 59: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION ...
Page 75: ...February 17 2010 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION ...
Page 104: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Page 105: ......
Page 111: ......