April 30, 2014
4
912-275 PYRAMID ROOF
INSTALLATION INSTRUCTION
BEFORE YOU BEGIN
In addition to the components on the packing list you will need a
drill and 3/4” drill bit, tape measure, marker, and a ladder.
INSTALLATION STEPS
__1)
Review all instructions before beginning:
__2)
Unpack, organize, and identify all components:
Be sure to
place all painted components on a protective surface (cardboard,
cloth, etc…) to prevent damage.
__3)
Locate placement of the Pyramid Roof:
See top down view
of your instruction booklet.
__4)
Temporarily set the Roof Brackets and Pyramid Roof in
place:
You will need to set each of the four Roof Brackets (2) on
the posts that will support the Pyramid Roof. The rounded side of
the Roof Bracket will face to the inside of the deck.
Do not
permanetaly attach them at this time.
Now you can set the Pyramid
Roof onto the Roof Brackets. (See detail A)
__5)
Center the Pyramid Roof:
Measure from each edge of the
four Roof Brackets to the edge of the Pyramid Roof to center the
Pyramid Roof over the deck. Mark the eight holes in the four Roof
Brackets.
Summary of Contents for Quick Ship 3 Modified
Page 1: ... 012 3 4 5 2 6 7 8 9 8 6 0 5 4 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...QUICK SHIP 3 MODIFIED Installation Guide ...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 29: ......
Page 31: ......
Page 34: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Page 41: ...March 13 2014 4 922 135 3 TRANSFER STATION INSTALLATION INSTRUCTION ...
Page 51: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION ...
Page 59: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION ...
Page 75: ...February 17 2010 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION ...
Page 104: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Page 105: ......
Page 111: ......