March 11, 2014
8
922-120-3 CORKSCREW 3’ DECK
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__8)
Install the Corkscrew climber:
Place the Corkscrew Climber
over the stub on the Arch Wall and secure it with the 5/16” x 1 ¾”
Button Head Bolt (9), 5/16” Button Head Nut (10), and 5/16” Lock
Washer (11). (See detail C)
__9) Once the entire playground has been installed and you have
verified that the entire playground is level you can
add the
concrete to the footing holes
. Be sure to use concrete with a
minimum 2,500 psi and mix the concrete per the manufacturer’s
directions before you pour it into the footing hole. Once the
footing has been filled with concrete you should rope of the area for
a minimum of 48 hours to allow the concrete set properly.
__10)
Once the concrete has set
, back fill dirt over the footing
holes; inspect the area and components for tools, hazardous debris,
and sharp edges. Verify all components are installed and all
hardware is tight and then install the safety surfacing.
__11)
Inspect the components
for sharp edges and if necessary
file them down and apply touch up paint.
Summary of Contents for Quick Ship 3 Modified
Page 1: ... 012 3 4 5 2 6 7 8 9 8 6 0 5 4 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...QUICK SHIP 3 MODIFIED Installation Guide ...
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 29: ......
Page 31: ......
Page 34: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION ...
Page 41: ...March 13 2014 4 922 135 3 TRANSFER STATION INSTALLATION INSTRUCTION ...
Page 51: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION ...
Page 59: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION ...
Page 75: ...February 17 2010 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION ...
Page 104: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX ...
Page 105: ......
Page 111: ......