25
Spectra ships the high pressure module with the white Z-Brane anode removed from its socket
to prevent shipping damage. Before the high pressure module (Clark Pump and membrane) is
mounted the anode should be installed.
The membrane housing has been capped with shipping plugs to keep the membranes clean
and moist during shipping and storage. Remove the C-clips that secure the shipping plugs,
then remove the shipping plugs. Insert an anode into the membrane until the groove is flush
with the membrane end plug. The C-clip will then slip into the groove, and the C-clip screw will
secure the clip.
C-Clip and retaining screw with
probe installed
Shipping Plug
(remove to
insert probe)
C-Clip groove in Anode
NOTE: your watermaker will
only have one membrane.
In these pictures there are
three membranes.
C CLip
Z-Brane Installation
Summary of Contents for Ventura 150T MPC
Page 2: ...2 ...
Page 4: ...4 ...
Page 7: ...7 Installation ...
Page 8: ...8 ...
Page 14: ...14 ...
Page 28: ...28 ...
Page 29: ...29 Operation ...
Page 30: ...30 ...
Page 38: ...38 ...
Page 39: ...39 Maintenance Storage and Troubleshooting ...
Page 40: ...40 ...
Page 60: ...60 ...
Page 61: ...61 MPC 5000 Programming and Controls ...
Page 62: ...62 ...
Page 72: ...72 ...
Page 74: ...74 ...
Page 75: ...75 Exploded Views and Part Numbers ...
Page 76: ...76 ...
Page 84: ...84 Parts HP CYL 3 4R ...
Page 85: ...85 PL MTS 3 8X1 2S HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts ...
Page 86: ...86 ...