Avoid running the Ventura system if the vessel is in contaminated water. The system should be
fully tested before leaving port. If the location or weather prevents proper testing, refer to Dry
Testing with an Artificial Ocean on page 34.
Warning! Damage may occur if the purge sequence is bypassed and the membrane is
pressurized with storage chemical in it.
First check:
Thru-hull inlet and the brine discharge valves are open.
All of your hose connections are tight.
The washer with the green tag under the pressure relief valve has been removed.
The pressure relief valve is open 1/2 turn.
The toggle switch on the MPC control box is set to the Auto position.
There are at least several gallons of water in your fresh water tank for priming.
New System Start-Up and Testing
Open 1/2 Turn when purging chemicals!
Remove Tag and Washer!
Power up the system by turning on the cir-
cuit breaker. After a few seconds a mes-
sage on the display will read “Open Pres-
sure Relief Valve Now”:
Push the Auto Run Button. The feed
pump will start and the message
“Purging Storage Solution” will appear:
Summary of Contents for Ventura 150T MPC
Page 2: ...2 ...
Page 4: ...4 ...
Page 7: ...7 Installation ...
Page 8: ...8 ...
Page 14: ...14 ...
Page 28: ...28 ...
Page 29: ...29 Operation ...
Page 30: ...30 ...
Page 38: ...38 ...
Page 39: ...39 Maintenance Storage and Troubleshooting ...
Page 40: ...40 ...
Page 60: ...60 ...
Page 61: ...61 MPC 5000 Programming and Controls ...
Page 62: ...62 ...
Page 72: ...72 ...
Page 74: ...74 ...
Page 75: ...75 Exploded Views and Part Numbers ...
Page 76: ...76 ...
Page 84: ...84 Parts HP CYL 3 4R ...
Page 85: ...85 PL MTS 3 8X1 2S HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts ...
Page 86: ...86 ...