12
Water Flow
Sea Strainer: Mount with
included Quick Block
Feed Pump Module. Mount vertically and as low as
practical, no more than 3’ (1 M) above waterline. Do
not mount over electrical equipment. Leave clear-
ance below for filter changes.
20 and 5 micron filters. Do not
mount over electrical equipment.
Leave clearance underneath for filter
changes.
Accumulator Tank
with analogue feed
pressure gauge
Fresh water flush inlet to charcoal
filter. Plumb to pressurized side of
onboard fresh water system. Op-
tional Z-ION will replace this filter
housing.
Spectra Clark Pump. Mount in a cool location. May
be oriented in any position and can be well above
waterline. Leave access to the pressure relief valve.
Do not mount over electrical equipment. Note: Salini-
ty probe must always be down (to stay wet), so you
will need to reorient the diversion manifold if the
module is mounted upside down.
Brine Discharge thru-hull. Place
above waterline or tee into an-
other visible drain. Thru-hull not
supplied
Dedicated 1/2” or 3/4” scoop strainer thru-hull and sea-
cock. Mount low, in a clear flow and away from head dis-
charge. Thru-hull is owner supplied.
Red In
Green Out
Ventura MPC Plumbing
MPC Control Box: Remember to
mount in central location, where vari-
ous cables can reach all components
and the power supply.
Summary of Contents for Ventura 150T MPC
Page 2: ...2 ...
Page 4: ...4 ...
Page 7: ...7 Installation ...
Page 8: ...8 ...
Page 14: ...14 ...
Page 28: ...28 ...
Page 29: ...29 Operation ...
Page 30: ...30 ...
Page 38: ...38 ...
Page 39: ...39 Maintenance Storage and Troubleshooting ...
Page 40: ...40 ...
Page 60: ...60 ...
Page 61: ...61 MPC 5000 Programming and Controls ...
Page 62: ...62 ...
Page 72: ...72 ...
Page 74: ...74 ...
Page 75: ...75 Exploded Views and Part Numbers ...
Page 76: ...76 ...
Page 84: ...84 Parts HP CYL 3 4R ...
Page 85: ...85 PL MTS 3 8X1 2S HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts ...
Page 86: ...86 ...