27
Z-Brane Operation
During normal operation the Red LED should be on. Power needs to be supplied to the Z-
Brane unit whenever you wish to prevent bio-fouling and scaling. We recommend flushing
your watermaker with fresh water after each use, which will protect your membrane and
also prevent corrosion in the feed water system. Thoroughly fresh water flush the water-
maker several times before leaving the vessel unattended for extended periods.
The Z-Brane may be de-powered if the system is pickled with chemicals or winterized with
propylene glycol.
DO NOT DISCONNECT OR SPLICE ANY OF
THE HIGH VOLTAGE WIRING!
Contact the factory if modifications are
required.
Power on LED
High Voltage
connector
Summary of Contents for Ventura 150T MPC
Page 2: ...2 ...
Page 4: ...4 ...
Page 7: ...7 Installation ...
Page 8: ...8 ...
Page 14: ...14 ...
Page 28: ...28 ...
Page 29: ...29 Operation ...
Page 30: ...30 ...
Page 38: ...38 ...
Page 39: ...39 Maintenance Storage and Troubleshooting ...
Page 40: ...40 ...
Page 60: ...60 ...
Page 61: ...61 MPC 5000 Programming and Controls ...
Page 62: ...62 ...
Page 72: ...72 ...
Page 74: ...74 ...
Page 75: ...75 Exploded Views and Part Numbers ...
Page 76: ...76 ...
Page 84: ...84 Parts HP CYL 3 4R ...
Page 85: ...85 PL MTS 3 8X1 2S HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts ...
Page 86: ...86 ...