22
Z-Ion Installation
The Z-Ion replaces the fresh water flush module on the feed pump module, and will come in-
stalled if you ordered your system with the optional Z-Ion. The Z-Ion filter bowl, like the nor-
mal fresh water flush module, houses the charcoal filter, which must be replaced every six
months.
The Z-Ion control box comes with four-foot cables for flexibility in mounting on the bulkhead
above or adjacent to the feed pump module.
Plug the connector from the Z-Ion generator bowl into the connector from the Z-Ion control
box.
Connect the power/signal cable, marked green, from the Z-Ion control box to the Z-Ion control
cable, also marked green, coming from the MPC box.
1.5 GPM Flow regulator
Manual shut-off valve (close
when changing filters)
Solenoid valve (opens during fresh
water flush/Z-Ion treatment)
Z-Ion control box
Connector to generator
bowl (2-pin)
Connector to MPC control box
(3-pin, labeled green)
Summary of Contents for Ventura 150T MPC
Page 2: ...2 ...
Page 4: ...4 ...
Page 7: ...7 Installation ...
Page 8: ...8 ...
Page 14: ...14 ...
Page 28: ...28 ...
Page 29: ...29 Operation ...
Page 30: ...30 ...
Page 38: ...38 ...
Page 39: ...39 Maintenance Storage and Troubleshooting ...
Page 40: ...40 ...
Page 60: ...60 ...
Page 61: ...61 MPC 5000 Programming and Controls ...
Page 62: ...62 ...
Page 72: ...72 ...
Page 74: ...74 ...
Page 75: ...75 Exploded Views and Part Numbers ...
Page 76: ...76 ...
Page 84: ...84 Parts HP CYL 3 4R ...
Page 85: ...85 PL MTS 3 8X1 2S HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts ...
Page 86: ...86 ...