32
Spectra ships the high pressure module with the white Z-Brane anode removed from its socket
to prevent shipping damage. Before the high pressure module (Clark Pump and membrane) is
mounted the anode should be installed.
The membrane housing has been capped with shipping plugs to keep the membranes clean
and moist during shipping and storage. Remove the C-clips that secure the shipping plugs,
then remove the shipping plugs. Insert an anode into the membrane until the groove is flush
with the membrane end plug. The C-clip will then slip into the groove, and the C-clip screw will
secure the clip.
C-Clip and retaining screw with
probe installed
Shipping Plug
(remove to
insert probe)
C-Clip groove in Anode
NOTE: your watermaker will
only have one membrane.
In these pictures there are
three membranes.
C CLip
Z-Brane Installation
Summary of Contents for Catalina 340 Z
Page 2: ...2 ...
Page 4: ...4 ...
Page 6: ...6 ...
Page 8: ...8 ...
Page 10: ...10 ...
Page 11: ...11 Installation ...
Page 12: ...12 ...
Page 22: ...22 John Guest Super Speedfit Fittings ...
Page 34: ...34 ...
Page 35: ...35 Operation ...
Page 36: ...36 ...
Page 44: ...44 ...
Page 45: ...45 Maintenance Storage and Troubleshooting ...
Page 46: ...46 ...
Page 64: ...64 ...
Page 65: ...65 MPC 5000 Programming and Controls ...
Page 66: ...66 ...
Page 76: ...76 ...
Page 78: ...78 ...
Page 79: ...79 Exploded Views and Part Numbers ...
Page 80: ...80 ...
Page 88: ...88 Parts ...
Page 89: ...89 Parts PL MTS 3 8X1 2B HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts ...
Page 90: ...90 ...