![SPECS 2D-CCD User Manual Download Page 8](http://html1.mh-extra.com/html/specs/2d-ccd/2d-ccd_user-manual_1343051008.webp)
7
Manual V2.docx | Status 10.12.2015 | Version 1
2
Preliminary tasks
Before using the detector, you need to perform standard procedures so that the detector is ready
for use.
Note
Initial installation and alignment is performed by SPECS engineers on delivery of the instrument.
These procedures are provided for reference in the Appendix of this manual.
This chapter describes the following:
•
Bakeout.
•
Suitable vacuum conditions for operation.
•
Conditioning the Spin detector .
•
Electrical connections.
•
Fitting the camera for the CCD detector.
•
Degassing the detector.
Baking out
2.1
In order to achieve UHV, you need to bake out the chamber. Before baking out, you should ensure
the following:
•
The chamber is leak-free with a pressure of 10
−7
mbar or lower.
•
All connection cables are removed.
•
The cameras are removed.
Switch off any power supplies before removing cables.
The maximum bakeout temperature for the 2D-CCD / 3D-VLEED Detector is 150°C. You should
attach a thermocouple to the detector flange to monitor the temperature during bakeout.
Note
Remember to observe the maximum bakeout temperature for all other instruments on the
chamber!
After baking out, the analyzer needs two days to cool down in order to protect the working
surfaces of the detector. The interior parts of the PHOIBOS will cool down significantly more
slowly than the casing. You should wait until the detector assembly has cooled down completely—
this takes approximately 2–3 days.
Caution!
Manual V2.docx | Status 10.12.2015 | Version 1
Summary of Contents for 2D-CCD
Page 1: ...User Manual Status 10 12 2015 Version 1 0 User Manual V1 0 October 19 2015...
Page 42: ...41 Manual V2 docx Status 10 12 2015 Version 1 Figure 22 The component spectra...
Page 53: ...52 Manual V2 docx Status 10 12 2015 Version 1 Figure 26 Quantum well state of 12 ML Pb Cu 111...
Page 57: ...56 Manual V2 docx Status 10 12 2015 Version 1 Figure 29 Wiring diagram for hardware type 156...
Page 85: ...84 Manual V2 docx Status 10 12 2015 Version 1 0...