19
Manual V2.docx | Status 10.12.2015 | Version 1
This template is essentially identical to the PHOIBOS 1D Adjustment template, except that
the SpinDetector Control is set to Channel 2.
3.1.5
UPS Spin Step Profile
This temple is used to carry out actual measurements with the spin detector.
The following sections describe the template in greater detail. It is useful to know the
function of the components in the schedule if you want to modify the template.
Devices
The following devices are required:
•
UV Dummy: Provides the operating parameters for the excitation source.
•
PHOIBOS 1D: Controls the PHOIBOS analyzer. This includes the setting for the
rotator (–1 or 1).
•
Magnetic Pulse Control: Allows you to magnetize the target during the experiment.
•
Spin Detector Control: Sets the parameters for the Ferrum spin detector.
Sleep
When you start the experiment, the devices are initialized. In particular, charging the
magnetic pulse controller and magnetizing the target takes some time. The sleep item makes
SpecsLab Prodigy wait before going on to the next step.
Step Profile
For each entry in the step profile, the magnetization of the sample is changed before the
spectra defined in the spectrum group are measured. The setting in the template contains
eight iterations, which are sufficient to obtain results which are not affected with time drift.
Also see the Focus Ferrum Spin detector manual.
Sleep
The second sleep item gives the system time to magnetize the target.
Spectrum Group
Defines the spectrum. See the SpecsLab Prodigy manual.
Performing CCD measurements
3.2
Taking data with the CCD detector follows the standard procedure described in
SpecsLab Prodigy Quick Guide and Online Help. Please see this documentation for an
example of how to set up a spectrum and measure data.
Summary of Contents for 2D-CCD
Page 1: ...User Manual Status 10 12 2015 Version 1 0 User Manual V1 0 October 19 2015...
Page 42: ...41 Manual V2 docx Status 10 12 2015 Version 1 Figure 22 The component spectra...
Page 53: ...52 Manual V2 docx Status 10 12 2015 Version 1 Figure 26 Quantum well state of 12 ML Pb Cu 111...
Page 57: ...56 Manual V2 docx Status 10 12 2015 Version 1 Figure 29 Wiring diagram for hardware type 156...
Page 85: ...84 Manual V2 docx Status 10 12 2015 Version 1 0...