65
Manual V2.docx | Status 10.12.2015 | Version 1.0
Figure 38. The Ferrum detector supported from the crane.
Mount a fresh CF 200 gasket and carefully slide the adapter lens into the CF 200 flange of the
CCD/rotator/deflector part. Check that the pumping port is aligned correctly and tighten the
bolts, see Figure 39.
Figure 39. The Ferrum detector mounted on the CCD/deflector/rotator part.
Summary of Contents for 2D-CCD
Page 1: ...User Manual Status 10 12 2015 Version 1 0 User Manual V1 0 October 19 2015...
Page 42: ...41 Manual V2 docx Status 10 12 2015 Version 1 Figure 22 The component spectra...
Page 53: ...52 Manual V2 docx Status 10 12 2015 Version 1 Figure 26 Quantum well state of 12 ML Pb Cu 111...
Page 57: ...56 Manual V2 docx Status 10 12 2015 Version 1 Figure 29 Wiring diagram for hardware type 156...
Page 85: ...84 Manual V2 docx Status 10 12 2015 Version 1 0...