![SPECS 2D-CCD User Manual Download Page 60](http://html1.mh-extra.com/html/specs/2d-ccd/2d-ccd_user-manual_1343051060.webp)
59
Manual V2.docx | Status 10.12.2015 | Version 1.0
Figure 31. Venting with dry nitrogen.
Caution!
Both parts are heavy and fragile. Use a crane when mounting the detector.
Caution!
The two parts cannot be pre-assembled, but must be mounted onto the system in sequence.
Neither is it possible to remove the two parts from the PHOIBOS analyzer as one unit. Doing
so will damage the detector.
Caution!
Do not open the smaller flange which holds the Ferrum detector to the adapter flange (the
flange is labeled "Do not open"). If this flange is opened, rewiring of the detector is
necessary.
A.2.1 Mounting the CCD/rotator/deflector part
Start with mounting the PHOIBOS analyzer on the vacuum chamber, as described in the
PHOIBOS manual. Then support the CCD/rotator/deflector part from the crane, as shown in
Figure 32. Make sure that the component hangs horizontally. Remove the protective cap and
the CF 200 Flange with the CF 40 window.
Summary of Contents for 2D-CCD
Page 1: ...User Manual Status 10 12 2015 Version 1 0 User Manual V1 0 October 19 2015...
Page 42: ...41 Manual V2 docx Status 10 12 2015 Version 1 Figure 22 The component spectra...
Page 53: ...52 Manual V2 docx Status 10 12 2015 Version 1 Figure 26 Quantum well state of 12 ML Pb Cu 111...
Page 57: ...56 Manual V2 docx Status 10 12 2015 Version 1 Figure 29 Wiring diagram for hardware type 156...
Page 85: ...84 Manual V2 docx Status 10 12 2015 Version 1 0...