![Speck pumpen Badu Jet V2 Active Installation, Mounting And Operating Instructions Download Page 52](http://html.mh-extra.com/html/speck-pumpen/badu-jet-v2-active/badu-jet-v2-active_installation-mounting-and-operating-instructions_1341779052.webp)
51
09.05.2007 TB-b BTA_einhaengeanlagen_v2_engl.indd
Exchanging the light bulb
For technical reasons the 300 W light bulb must be exchanged together with the
light assembly.
To make sure that the light bulb is defective, i.e. that it was not just switched off
by the thermostat (see part 8 of the Operations Manual), the light should be swit-
ched on again after approx. 30 minutes.
When removing the light unit proceed as follows:
1. Switch unit OFF at the housing.
2. Disconnect pump and light from the power supply.
3. Undo the cover
4. Remove unit from the pool edge.
5. Pull unit from the pool and lay it down.
6. Detach light cable from the junction box and pull it out.
7. Remove the two screws at the light mantle
8. Pull light assembly together with connecting cable from the housing.
9. Return light assembly to your dealer - or directly to the manufacturer - for
replacement.
10. Reassemble the light assembly in reversed order.
Summary of Contents for Badu Jet V2 Active
Page 1: ......
Page 16: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 15 Abb 3 Abb 4 ...
Page 17: ...16 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 6 Abb 5 ...
Page 23: ...22 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 17 ...
Page 24: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 23 Abb 18 ...
Page 25: ...24 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 19 Abb 20 ...
Page 26: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 25 Abb 21 ...
Page 29: ...28 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 22 ...
Page 32: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 31 Abb 23 ...
Page 35: ...34 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 24 ...
Page 38: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 37 Abb 25 ...
Page 55: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 54 Fig 3 Fig 4 ...
Page 56: ...55 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 6 Fig 5 ...
Page 62: ...61 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 17 ...
Page 64: ...63 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 19 Fig 20 ...
Page 65: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 64 Fig 21 ...
Page 68: ...67 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 22 ...
Page 71: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 70 Fig 23 ...
Page 74: ...73 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 24 ...
Page 77: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 76 Fig 25 ...
Page 94: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 93 Schéma 3 Schéma 4 ...
Page 95: ...94 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 5 Schéma 6 ...
Page 101: ...100 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 17 ...
Page 102: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 101 Schéma 18 ...
Page 104: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 103 Schéma 21 ...
Page 107: ...106 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 22 ...
Page 110: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 109 Schéma 23 ...
Page 113: ...112 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 24 ...
Page 116: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 115 Schéma 25 ...
Page 120: ......