47
09.05.2007 TB-b BTA_einhaengeanlagen_v2_engl.indd
See also page 17
fi
g.11.
necessary to fully aerate the jet unit. It is thereby useful to allow the
fi
lter
pump to run for a while, so as to warrant a thorough aeration.
6.5.3 ATTENTION!
If you have an overhang
fi
ltration system with a non-self priming
fi
lter
pump,
fi
ll the pump according to manufacturer’s guidelines using the
overhang skimmer and priming plate. Proceed to activate the
fi
lter pump.
After having carefully aerated and
fi
lled the vacuum hose, attach one end
to the nozzle of the jet unit and the other to the overhang skimmer of the
running
fi
lter unit. Push the skimmer down slightly when reattaching the
cover. Now the jet unit is being
fi
lled / aerated by the
fi
lter system.
If the water
fl
ow is interrupted because air has been taken in, repeat the
above process. It is advised to pump water through the jet for approxi-
mately 1 minute. Then turn the
fi
lter pump off and remove the hose.
6.5.4
The BADU Jet unit is now ready for use and can be switched on.
IMPORTANT: Make sure that the air regulation is always closed during
aeration, as this can result in an intake of air and a failure to prime the
pump.
7. - Electrical Connection
Power source: single-phase, 230 V, 50 Hz or 3N-phase, 400/230V 50 Hz.
All electrical connections should be made by a licensed electrician
under strict observation of the rules and regulations of EN 60335-2-41
: 1996; IEC 64/906/FDIS; E DIN IEC 64/906/FDIS und VDE 0100 Part
702/ A1 : 1997, or local standards and regulations. The unit should be
connected to the power supply as indicated in the wiring diagram. The
conduit for the underground cable must be buried at least 60 - 80 cm
below the surface. A plastic armored conduit should be used.
Attention!
The motor housing must be connected to the equipotential earth wire.
For this purpose a terminal has been provided on the motor housing.
8. - Connection at the installation site
These parts are not included in the scope of the delivery and must be
provided for at the installation site.
1. Fi switch, I
∆Ν
≤
30 mA
2. Fuse 16 A, time lag at 230 V and 400 V
3. All-pole switch with O and 1 markings
For circuit diagram
see Pages 17-20
Summary of Contents for Badu Jet V2 Active
Page 1: ......
Page 16: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 15 Abb 3 Abb 4 ...
Page 17: ...16 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 6 Abb 5 ...
Page 23: ...22 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 17 ...
Page 24: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 23 Abb 18 ...
Page 25: ...24 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 19 Abb 20 ...
Page 26: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 25 Abb 21 ...
Page 29: ...28 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 22 ...
Page 32: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 31 Abb 23 ...
Page 35: ...34 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 24 ...
Page 38: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 37 Abb 25 ...
Page 55: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 54 Fig 3 Fig 4 ...
Page 56: ...55 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 6 Fig 5 ...
Page 62: ...61 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 17 ...
Page 64: ...63 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 19 Fig 20 ...
Page 65: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 64 Fig 21 ...
Page 68: ...67 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 22 ...
Page 71: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 70 Fig 23 ...
Page 74: ...73 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 24 ...
Page 77: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 76 Fig 25 ...
Page 94: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 93 Schéma 3 Schéma 4 ...
Page 95: ...94 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 5 Schéma 6 ...
Page 101: ...100 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 17 ...
Page 102: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 101 Schéma 18 ...
Page 104: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 103 Schéma 21 ...
Page 107: ...106 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 22 ...
Page 110: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 109 Schéma 23 ...
Page 113: ...112 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 24 ...
Page 116: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 115 Schéma 25 ...
Page 120: ......