![Speck pumpen Badu Jet V2 Active Installation, Mounting And Operating Instructions Download Page 50](http://html.mh-extra.com/html/speck-pumpen/badu-jet-v2-active/badu-jet-v2-active_installation-mounting-and-operating-instructions_1341779050.webp)
49
09.05.2007 TB-b BTA_einhaengeanlagen_v2_engl.indd
Scope of delivery (only for BADU Jet impulse)
- Massage hose for large nozzle, 40 mm
- Pulsator for large nozzle, 40 mm
Accessories (optional)
- Massage hose for large nozzle, 40 mm
- Massage hose for small nozzle, 28 mm
- Massage hose with pulsating massage nozzle for large nozzle, 40 mm
- Massage hose with pulsating massage nozzle for small nozzle, 28 mm
- Pulsator for large nozzle, 40 mm
- Pulsator for small nozzle, 28 mm
- Pinpoint massage nozzle for large nozzle, 40 mm
- Pinpoint massage nozzle for small nozzle, 28 mm
- Cap for large nozzle, 40 mm
- Cap for small nozzle, 28 mm
- Telescoping safety support for above-ground pools
Using the massage hose
a)
The massage hose, i.e. water massage in general, should only be
used after consulting a physician. Do not allow children to use the mas-
sage hose!
b)
The air regulator should be shut off before massage, because
otherwise water may be forced out through it due to the increased
pressure.
11. - Servicing and Maintenance
The unit should be periodically tested for operational safety, especially
the following areas:
1. Watertight connection between hydraulic parts and motor
2. Stability of unit. All impurities should be removed.
3. All electrical contacts in general should be checked.
4. Independent earth connection
Please also observe VDE 0100 Part 620
- The pump may only be repaired by the manufacturer or a repair shop
designated by the manufacturer.
- In case of pump leakage, the pump may not be operated and must be
disconnected from the power supply.
We reserve the right to make technical changes.
*) Not applicable
for BADU Jet stan-
dard and BADU
Jet active.
Summary of Contents for Badu Jet V2 Active
Page 1: ......
Page 16: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 15 Abb 3 Abb 4 ...
Page 17: ...16 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 6 Abb 5 ...
Page 23: ...22 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 17 ...
Page 24: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 23 Abb 18 ...
Page 25: ...24 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 19 Abb 20 ...
Page 26: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 25 Abb 21 ...
Page 29: ...28 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 22 ...
Page 32: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 31 Abb 23 ...
Page 35: ...34 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 24 ...
Page 38: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 37 Abb 25 ...
Page 55: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 54 Fig 3 Fig 4 ...
Page 56: ...55 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 6 Fig 5 ...
Page 62: ...61 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 17 ...
Page 64: ...63 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 19 Fig 20 ...
Page 65: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 64 Fig 21 ...
Page 68: ...67 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 22 ...
Page 71: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 70 Fig 23 ...
Page 74: ...73 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 24 ...
Page 77: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 76 Fig 25 ...
Page 94: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 93 Schéma 3 Schéma 4 ...
Page 95: ...94 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 5 Schéma 6 ...
Page 101: ...100 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 17 ...
Page 102: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 101 Schéma 18 ...
Page 104: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 103 Schéma 21 ...
Page 107: ...106 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 22 ...
Page 110: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 109 Schéma 23 ...
Page 113: ...112 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 24 ...
Page 116: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 115 Schéma 25 ...
Page 120: ......