09.05.2007 TB-b BTA_einhaengeanlagen_v2_engl.indd
48
9. - Suggestion for Installation
10. - Operation
10.1
Switching the unit ON or OFF is done by pressing the pneumatic push
button built into the housing, page 17
fi
g. 7 + 8) The pushbutton can be
actuated from inside the pool.
10.2
The air regulator enables the intake of air in order to achieve a bubbling
effect. The amount of air that is taken in can be regulated from inside the
pool, page 17
fi
g. 7 + 8).
10.3
The ball-type nozzle swivels. Normally it should be in vertical position,
i.e. pointing slightly upward. This will produce the optimal effect for
counter swimming.
10.4
Attention! On models
fi
tted with adjustable nozzle* always make sure the
nozzle is fully open before use (turn anti-clockwise).
10.5
Attention! Do not step on the cover!
10.6
For winterizing, the unit should be taken out of the pool. I should
be completely drained and stored in a dry place.
10.7
Attention! Watch out for maximal water level, see
fi
g. 3 + 6 as well as the
markings on the unit.
Non-optimal water
level can lead to
malfunctioning.
Fig.1
Summary of Contents for Badu Jet V2 Active
Page 1: ......
Page 16: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 15 Abb 3 Abb 4 ...
Page 17: ...16 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 6 Abb 5 ...
Page 23: ...22 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 17 ...
Page 24: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 23 Abb 18 ...
Page 25: ...24 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 19 Abb 20 ...
Page 26: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 25 Abb 21 ...
Page 29: ...28 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 22 ...
Page 32: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 31 Abb 23 ...
Page 35: ...34 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 24 ...
Page 38: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 37 Abb 25 ...
Page 55: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 54 Fig 3 Fig 4 ...
Page 56: ...55 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 6 Fig 5 ...
Page 62: ...61 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 17 ...
Page 64: ...63 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 19 Fig 20 ...
Page 65: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 64 Fig 21 ...
Page 68: ...67 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 22 ...
Page 71: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 70 Fig 23 ...
Page 74: ...73 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 24 ...
Page 77: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 76 Fig 25 ...
Page 94: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 93 Schéma 3 Schéma 4 ...
Page 95: ...94 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 5 Schéma 6 ...
Page 101: ...100 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 17 ...
Page 102: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 101 Schéma 18 ...
Page 104: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 103 Schéma 21 ...
Page 107: ...106 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 22 ...
Page 110: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 109 Schéma 23 ...
Page 113: ...112 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 24 ...
Page 116: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 115 Schéma 25 ...
Page 120: ......