45
09.05.2007 TB-b BTA_einhaengeanlagen_v2_engl.indd
For the safety of
the swimmers do
not operate the
unit without hou-
sing cover!
*) For BADU Jet
active: attach hose
directly to the con-
verter situated in
the terminal box of
the pump motor
5. - Installation
5.1
Select mounting site and prepare in accordance with page 22
fi
g. 17.
For BADU Jet active see page 24
fi
g. 20. When the unit is installed on an
aboveground pool, the telescoping safety support must be used. See
page 23
fi
g. 18. For BADU Jet active see page 24
fi
g. 19.
5.2
Make sure the shipment contains all parts enumerated in the packing list.
5.3
Place unit on the pool edge and mark mounting holes.
5.4
Remove unit again, drill holes of 10 mm diameter at markings.
5.5
Insert brass expanding bolt (25) and fasten bonded metal (rubber metal)
buffer (26), see page 17
fi
g. 10.
Make sure that the bolts are securely anchored in the base plate so that
the unit will be totally stable.
5.6
Place unit onto bonded-metal buffers and fasten by means of hex bolts
(32) with lock washers (31) plus another washer (30), see page 17
fi
g.10.
5.7
By equalizing the distance, the actual distance between the unit housing
and the pool edge is adjusted. This will result in added stability for the
unit.
5.8
Plug in woven-fabric
fl
exible tubing (6), 14 mm dia., for air-intake onto
the hose tail of the air regulator and fasten by means of clamp (18), see
page 17
fi
g. 7. The connection is located inside the housing.
5.9
Push plastic tubing (36), page 17
fi
g. 7, dia. 3 x 1,5 mm from the
pneumatic pushbutton onto the hose tail of the pressure converter at the
control box.*
5.10
Before connecting the power supply, please carefully read part 7,
“Electrical Connection”, and part 8, “Electrical Connection at Installation
Site”.
5.11
Connect power supply in accordance with Part 7, “Electrical Connection”
5.12
ATTENTION! This is important! When you put the cover back in its
place, make sure that it snaps snugly into place over the position switch.
Fasten the cover securely to the base plate**. The position switch is now
activated, the circuit is closed and the unit is ready to function.
5.13
Connect the safety-catch of the housing with the housing unit, see
page 17
fi
g. 9.
**) Tighten the
screws only by
hand. Do not use
force!
Summary of Contents for Badu Jet V2 Active
Page 1: ......
Page 16: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 15 Abb 3 Abb 4 ...
Page 17: ...16 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 6 Abb 5 ...
Page 23: ...22 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 17 ...
Page 24: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 23 Abb 18 ...
Page 25: ...24 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 19 Abb 20 ...
Page 26: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 25 Abb 21 ...
Page 29: ...28 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 22 ...
Page 32: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 31 Abb 23 ...
Page 35: ...34 09 05 2007 TB b BTA_einhaengeanlagen_v2 indd Abb 24 ...
Page 38: ...09 05 2007 TB b BTA_einhaengeanlagen_v2 indd 37 Abb 25 ...
Page 55: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 54 Fig 3 Fig 4 ...
Page 56: ...55 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 6 Fig 5 ...
Page 62: ...61 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 17 ...
Page 64: ...63 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 19 Fig 20 ...
Page 65: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 64 Fig 21 ...
Page 68: ...67 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 22 ...
Page 71: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 70 Fig 23 ...
Page 74: ...73 09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd Fig 24 ...
Page 77: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_engl indd 76 Fig 25 ...
Page 94: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 93 Schéma 3 Schéma 4 ...
Page 95: ...94 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 5 Schéma 6 ...
Page 101: ...100 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 17 ...
Page 102: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 101 Schéma 18 ...
Page 104: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 103 Schéma 21 ...
Page 107: ...106 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 22 ...
Page 110: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 109 Schéma 23 ...
Page 113: ...112 09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd Schéma 24 ...
Page 116: ...09 05 2007 TB b BTA_einhaengeanlagen_v2_frz indd 115 Schéma 25 ...
Page 120: ......