
8-13
HDW-F900R/V1 (E)
Adjustment Procedure
3. T tension regulator operating position adjustment
(1) Loosen the adjustment screw of the eject link assembly (B) by 1/2 turn.
(2) Insert the 3 mm flat head screwdriver tip into the adjustment hole of the eject
link assembly (B) and adjust position of the eject link assembly (B) until the
specification is satisfied.
(3) While maintaining the screwdriver setup as step (2), tighten the adjustment
screw of the eject link assembly (B).
Standard tightening torque : 20
x
10
_
2
N
.
m (2.0 kgf
.
cm)
(4) Confirm that the operating position of the T tension regulator satisfies the
specifications.
4. Releasing the mode
Rotate the manual eject gear (A) clockwise until the unit reaches the unthreading-
end state. (Refer to Section 7-1-4.)
5. REV back tension adjustment
(Refer to Section 8-1-4.)
Summary of Contents for CineAlta HDCAM HDW-F900R
Page 13: ...1 3 HDW F900R V1 E View of the outside panel assembly Front view ...
Page 14: ...1 4 HDW F900R V1 E 1 1 2 Locations of Main Mechanical Parts 1 2 3 4 5 6 7 8 9 0 ...
Page 108: ...2 18 HDW F900R V1 E 2 4 3 5 7 1 9 8 6 6 ...
Page 212: ......
Page 232: ......
Page 272: ......
Page 486: ......
Page 500: ......
Page 544: ......
Page 545: ......
Page 546: ...Printed in Japan Sony Corporation 2006 10 16 2006 HDW F900R SY E 9 968 281 02 ...