1-6
FVS-1000 MMP1
1-9. Installation Flow Chart
According to the following flow chart, install the FVS-1000.
As for the installation procedure, refer to section 1-10.
1-9. Installation Flow Chart
Start
1. Decision of the place to install
2. Installation
3. Confirmation of the voltage selector
4. Connection of the power supply code
5. Installation of the air blow assembly
6. Removing the screws used during transportation
7. Prevention of falling down
8. Installation of the control panel
9. Installation of the OPS assembly
10. Installation of the FVS-P1000 and BKFV-100/200
11. Turning on the power
12. Installation of the lens
13. Confirmation of the operation
Completion