1-5
FVS-1000 MMP1
1-7. Warning during Installation
c
Safety working
.
For safety, install the FVS-1000 by four or more persons. In addition, one or more of them should be
trained for the installation.
Keeping the parts
Store the parts removed during installation, making sure that they do not damage and do not interference
with work.
Also store all unpacked accessories supplied.
Installation work
The FVS-1000 is equipped with the optical equipments, sensors and driving rail etc. of which the high
accuracy must be maintained. Be careful not to put the pressure on them or damage them with the tools.
In addition, be careful not to deform and damage the parts of driving system.
Screws
.
When installing the FVS-1000, be careful not to forget tightening the screws. Put away the
unnecessary screws and do not leave the screws incompletely tightened. If the parts or screws fall
during the operation, there is a possibility of causing some trouble or mis-operation.
.
Screws must be tightened with the following tightening torque.
Hexagonal screws with hole (M3) : 1.0 N
.
m (10 kgf
.
cm)
Hexagonal screws with hole (M4) : 2.5 N
.
m (25 kgf
.
cm)
Hexagonal screws with hole (M5) : 3.5 N
.
m (35 kgf
.
cm)
Screw (
+
)
(M3) : 0.8 N
.
m (8 kgf
.
cm)
Screw (
+
)
(M4) : 1.4 N
.
m (14 kgf
.
cm)
1-8. Fixtures and Tools
To install the FVS-1000, the following fixtures and tools are necessary.
.
Metal scale
Length : 150 to 300 mm
.
L-shaped hexagonal wrench Subtense :10 mm, Subtense : 8 mm
.
Level
.
Screw driver (
+
)
M3 to M5
.
Screw driver (
_
)
M3 to M4
1-7. Warning during Installation
1-8. Jigs and Tools