PAT-80
● PAT-85 ● PAT-86 – USER MANUAL
64
5.3
Measurement of welding circuit leakage current I
L
Press
I
L
.
Before starting the measure-
ment, similarly to
sec. 4.2
, , fol-
lowing parameters must be set:
test duration
and
limit
.
Connect the welding machine
–
step
or
.
Variant with powering the welding machine from the meter’s test socket (only 1-phase, max. 16 A).
Summary of Contents for PAT-80
Page 1: ...1...
Page 2: ...2...
Page 97: ...PAT 80 PAT 85 PAT 86 USER MANUAL 95 NOTES...
Page 98: ...PAT 80 PAT 85 PAT 86 USER MANUAL 96 NOTES...
Page 99: ......
Page 100: ......