PAT-80
● PAT-85 ● PAT-86 – USER MANUAL
14
Substitute leakage current measurement
Mains nominal voltage
– is used to calculate the I
SUB
equivalent leakage current according to the
formula:
I
SUB
= (I
MEASURED
x U
n
)/U
MEASURED
Result for 1.06Un
– the result of I
SUB
measurement is multiplied by 1.06, which is required by some
standards.
Power cord for the appliance
Save lead
– after ticking this box, the power cord is saved in the memory and printed on a printout as
a separate appliance. Otherwise it is considered as an integral part of the appliance.
Unlock settings in Multibox
– if Multibox is switched on, the option enables changing the measure-
ment settings during the autoprocedure realization, however this change is possible only after the first
measurement of a given quantity.
Add compensation
– compensation of test leads resistance. Various values in depending on the
measuring current (200 mA, 10 A, 25 A).
Delay
– the delay between powering the tested object and starting a measurement.
3.3.5 Printing
Press
Configuration of tester
.
Press
Prints
.
In the main window you can
manage
communication
with
printers.
Enable printing
- enables /
disables
printer
support.
Auto printing
- automatic print-
ing after the test.
If you want to connect to your
Brother D3 printer via WiFi, you
must enter the last 4 digits of its
serial number in the
Serial No.
field.
Select
Label settings
to decide
what to print on the labels.
Summary of Contents for PAT-80
Page 1: ...1...
Page 2: ...2...
Page 97: ...PAT 80 PAT 85 PAT 86 USER MANUAL 95 NOTES...
Page 98: ...PAT 80 PAT 85 PAT 86 USER MANUAL 96 NOTES...
Page 99: ......
Page 100: ......