PAT-80
● PAT-85 ● PAT-86 – USER MANUAL
52
4.9
IEC cord test
IEC cord test includes checking wires continuity, short circuits between the wires, correctness of L-L
and N-N connection, PE resistance and insulation resistance measurement.
Press
IEC test
.
Before the measurement, similarly
to previous tests, following param-
eters must be set:
current,
time of R
PE
measurement,
R
PE
limit,
time of R
ISO
measurement,
R
ISO
limit.
Connect the mains plug of the cord into the test socket and the other end of the cord into the
IEC socket on the tester.
Press
START
.
Upon completing the measurement read the result. You can finish the test
before the defined test time duration by pressing
STOP
.
Positive test result: parameters are
within limits
Negative test result: parameters are
not within the limits
Information about irregularities in the lead
are displayed in the test results field.
Summary of Contents for PAT-80
Page 1: ...1...
Page 2: ...2...
Page 97: ...PAT 80 PAT 85 PAT 86 USER MANUAL 95 NOTES...
Page 98: ...PAT 80 PAT 85 PAT 86 USER MANUAL 96 NOTES...
Page 99: ......
Page 100: ......