SUNSYS HES L - 551697A - SOCOMEC
41
EN
7.5. Drilling
Drill all the holes marked:
- Dia ½ inch for the C-Cab
- Dia 5/8 inch for the B-Cab
7.6. Putting cabinets in place
Before installing on the floor, level the floor using provided shims. Maximum allowed deviations must be in the following
range: 0.06in for vertical direction, plus/minus 0.25in for horizontal direction (left to right), and plus/minus 0.25in for
horizontal direction (front to back).
Note: It is important for the unit to be leveled to ensure proper installation with the cable troughs from each battery
cabinet.
Put the cabinets in place, starting with the C-Cab on the right, and make sure to remove the side panels to have access to
the bolts.
Once fixed with a 54Nm torque, put the side panels back, with a 8N.m torque. Then put the B-Cabs in place.
Cabinet
Fixing holes
Recommended screws size
Tightening torque
C-Cab
M12 / ½ inch
54 Nm/40 ft-lb
B-Cab
M16 / 5/8 inch
81 Nm / 60 ft-lb