
Chapter 4
Installation and Start up
4.5 Coordinates
After installment of the analyzer and computer ,the pipettors’ plane
position should be coordinated at first .
4.5.1 Preparation for coordinate
:
Using two reaction modules fill 75
μ
l of water each into positions 1
and 6. Insert one module in the Left position next to the left pipetting
position, and the other in the the Right position next to the ight
pipetting position.
Five tubes ,which are filled with 100
μ
l of water ,should be respectively
placed at the track#1’s 1st and 10th position ,track#11’s 1st and 10th
position , and track#12’s 10th position
Fill the 1st vial (the position of magnetic particle) of the reagent kit
used to
Coordinate with 200
μ
l water , while the 2nd vial (the position
of low calibrator) with 200
μ
l water, the 4th vial (the position of
displacer) with 500
μ
l water, the 7th vial (the position of diluter) with
1000
μ
l water
Then slide the reagent kit into the track#1 of Reagent Area
Switch on to start the analyzer. Turn on the PC system. Double click
the
[Maglumi Service]
icon on the desktop , if the connection
between the PC and the analyzer is OK ,the
[Maglumi Service]
Interface will be shown as below Fig 4.5.1-1
Fig. 4.5.1-1: [MAGLUMI Service] dialog
Page 4-12
Operating instructions