
Chapter 4
Installation and Start up
4.2 Switching on and starting the system
Before the system may be turned on, it is necessary to ensure
that all steps in section 4.1.1 “
Electrical connections of the
system
” have been completed.
There are several different processes when starting the
MAGLUMI
®
system. The type of start is dependent on the
amount of time the MAGLUMI
®
analyzer was shut down.
Types of start up
·
Initial
Starting the PC system
·
Daily
Starting the system on at the beginning of the work day
·
Weekly Starting the system on at the beginning of the work week
·
Prolonged Starting the system after a period of more than 2 days
of inactivity
4.2.1 Starting the PC system
Turn on the PC & Monitor. Wait for the system to start (this is
completed when the “Desktop” window appears).
4.2.2 Starting the system at the beginning of the work day
Upon starting the working day, the following steps should be
completed:
1. Turn on the monitor.
2. Follow the “
Daily Maintenance Instructions
” found in chapter 18
(the maintenance may be accomplished either at the end or
beginning of the working day).
3. Complete the “
System Test
” according to chapter 9.
4.2.3 Starting the system at the beginning of the work week
Upon starting the working week (consisting of no more than two
consecutive days of inactivity), the following steps should be
completed
1. Turn on the monitor.
2. Double click on the “
Maglumi User
“ icon by using either the
mouse or the touch screen.
3. Enter the user name & password in the
[Login]
dialog, and press
<OK>
. The software will start.(you can select check
“√”
for the
<Initialization With Cuvette(s) Clear>
in the
[Login]
dialog ,
refer to section 8.2.1.)
4. Turn on the analyzer ,then the initialization will execute
automatically . If you have select check
“√”
for the
<Initialization With Cuvette(s) Clear>
in the
[Login],
The
analyzer will begin to clear all working channels in the system
to ensure no collisions occur during normal operation.
Page 4-6
Operating instructions