
f)
Secure the unit to the wall with suitable fixings to support an
approximate full assembly weight of TBDkg.
g)
Fit the pcb into the module using the fixings provided.
h)
Connect the appropriate cable ends to the appropriate terminals.
i)
Secure the lid to the module.
j)
Leave all outstanding installation work until the commissioning
stages.
78310-01NM Loop Powered Zone Module
Senator II Installation Manual
17-2
78910-03NM Issue 2_10/96