
b)
Remove the ceiling tile to which the base is to be fitted.
c)
Punch or drill the required cable entry and base fixing holes in the
tile.
d)
Feed the loop wires through the tile and base, and then secure the
base to the steel box.
e)
Re-fit the ceiling tile.
f)
Connect the wires to the terminal block on the main assembly and
secure the main assembly to the base using screws provided.
LOOP CABLE
STANDARD 60mm STEEL BOX (BESA BOX)
GLAND
BASE
CEILING TILE
SCREWS (NOT SUPPLIED)
TO SECURE BASE TO BESA BOX
MAIN ASSEMBLY
MAIN ASSEMBLY TO BASE
FIXING SCREWS
fl130
Figure 10-2 Fitting a t-breaker or slave unit
T-breaker and slave units
Senator II Installation Manual
10-2
78910-03NM Issue 2_10/96