E_MH_Instalation_instructions_Skylux_Climax_Panorama
20/11/2020
54/60
Specific installation tips for LED lighting
TRANSF
O
All work on electrical parts must be performed by a professional electrician according to the local rules and regulations for electrical
systems.
Installation of the LED lights on the gutter GDG:
Follow the instructions below during the installation and connection to the electrical system.
Transformer:
Foresee 1 transformer per LED strip of maximum 7 meters.
Pull the extenstion cable (6 m) through the lateral rafter of the
wall profile to the gutter.
Chip connection:
Connect the LED chip to the transformer chip (IP44).
The transformer is placed in the wall profile, for which there
is some space between the bottom wall profile and the
hinge profile.
LED lighting installation in GDG gutter:
A recess in which the LED strip fits will be available when the GDGL profile is slid with the opening downwards towards the GDG. A chip
for the connection to the transformer is located at the end of the LED strip. An additional 6-metre cable is also included to ensure the
transformer can be installed in an accessible location.