E_MH_Instalation_instructions_Skylux_Climax_Panorama
20/11/2020
30/60
Supports and side supports
Glazing: plastic sheets
INSTALLATION USING CONNECTORS AND GLASS
Fasten connectors K on to the hinge profiles using parker screws PST. Drill holes with a Ø of 4 mm in advance at the indicated lines
(left and right) of the connector. The holes are to be drilled to the left and right of the support, both on the wall and gutter side. Cut
away one wing of the connector when installing the side supports using K connectors to ensure that the connector is not in the way
laterally with regard to the finishing profile.
Allow for a clearance of at least 5 mm the side support will be fixed against a wall. Install spacers A1 or A2 between the supports on
hinge profile S1 or S2. The support seal C5 (for plastic sheets) or support seals C5 + C31 (for glass) will be installed here.
Slide the TP(G) profile completely up against the wall profile and fasten these AS HIGH AS POSSIBLE using 2 ZSG screws with a
neoprene O-ring. Ensure that all gutter side stop profiles area aligned. The TP(G) profile expands downwards.
C31
C5
A1/A2
ZSC
PST
K
D1/D2/D3
ZSC
PST
PST
K
ZSB
ZSB
K
GDG