20/11/2020
43/60
E_MH_Instalation_instructions_Skylux_Climax_Panorama
Tie bar for saddle roof
PREPARATION
To guarantee the stability of the saddle roof, a tie bar must be installed for every 2 supports. With a non-thermal bridge Climax saddle
roof, you must also use a tie bar set at the open end.
An eye bolt must be installed in these supports at the gutter side during the preparation phase. Drill a hole (Ø 10 mm) at 60 mm
from the end of the (side) support. The eye bolt must be fixed on the inside of the (side) support profile (D1 or D2) with a bolt (M10).
Repeat every 2 supports.
See the specific installation tips for the Climax Panorama single-pitch roof in this manual for information on the assembly of the gut-
ter, posts and (side) supports (pages 19-38).
ASSEMBLY
60 mm
8426
8424
The tie bar must be installed when all supports have been
installed and before you install the glazing. Screw the ridge fix-
ing to the bottom side of the ridge between 2 supports using an
eye bolt. Fasten the ridge fixings to the ridge using screws (ZSG).
Install the threaded bar ends to the eye bolts using the stainless
steel bolts (M10 x 30 mm) and the safety nuts (M10).
ZSG (4x)
M10 x 30
M10