E_MH_Instalation_instructions_Skylux_Climax_Panorama
20/11/2020
24/60
GDG gutter with Statik and angle posts
ASSEMBLE THE GUTTER COMPONENTS TO PREPARE FOR THE INSTALLATION OF THE GUTTER.
= LED
≠ LED
Cut out the opening for the water outlet.
Use a Ø 80 mm circular drill for this task.
Slide in hinge profile S1 or S2.
Slide in LED profile GDGL. Length GDGL = distance between
the posts.
(For information on LED lighting see page 54.)
* Reinforcement profile IPE 120 is not supplied. It can be bought at any local hardware shop.
We recommend treating the reinforcement profiles with an anti-corrosion product.
S1/S2
GDG
GDGL
Fix the GPT bracket. Predrill the IPE 4x and foresee screw
thread M10 to screw the bracket.
Slide in reinforcement profile IPE120* (optional) and install
the GDGK clips.
IPE120*
GDGK
‘click’
110
80
55
64
64
55
Ø 80
110
Slide the KO vessel in the gutter profile.
Installation of the U bracket PU72.
KO
4
5
ø 80
55
GPT
BGDG
M10x30 (3x)
4
5
55
64
80
55
GPT
BGDG
M10x30 (4x)