20/11/2020
53/60
E_MH_Instalation_instructions_Skylux_Climax_Panorama
Installation:
Specific installation tips for glazing connections
L432 /
L632
SG20
L432 / L632
Y16P
GVB
Y16P
GVB
Y10
SG20
SG20
SG20
SG2
0
CLST
GVT
CLSB
C8
Hilo 25/42
Application:
The glass connector is used for slanted roofs to create a watertight connection between two glass or two plastic sheet sections.
This is only possible with sheet support TP or TPG and the screw-in type clips CLSB with CLST/CLSL.
The following parts are used for a glass connection:
GVT top profile
Y16P thermal bridge
GSP 20 or GSP 8 buffer blocks
Bottom profile GVB
Adaptor profile Y10
Glass adhesive SG20
Assembly in relation to the glazing thickness:
For glazing 8 – 21 mm GVT + GVT (single glazing)
For double glazing or plastic sheets > 21 mm (GVB + GVT + Y16P + Y10)
Measurement and preparation:
SG20
SG20
SG
20
Add adhesive to the ribbed zone of bottom profile GVT and posi-
tion the profile as indicated. Press the profile evenly and ensure
there is counterpressure along the bottom side. Remove excess
adhesive and silicone sealant.
Install seals C8 in screw-in type clips CLSB. Drill holes with a Ø
of 5.5 mm every 50 cm, starting and ending at 20 cm from the
ends. Fasten profile CLSB to sheet support TPG using adapted
Hi-Lo screws. Press the clips (CLST/CLSL) manually or using a
rubber hammer.
Stick end profile L432 or L632 on to the glazing. Position the
bottom glass sheet on the conservatory supports. Press profile
GVB against the glazing. Position 2 plastic buffer blocks in-
between the glazing and bottom profile GVB. Repeat this for all
supports.
Add adhesive to the top ribbed zone of bottom profile GVB.
Position the top glass sheet and add 2 plastic buffer blocks
in-between the glass sheet and the stop shoulder without any
clearance.
Slide profiles Y16P and Y10 in bottom profile GVB in relation to
the glazing thickness according to the table on page 50.
The GVT profile is also used as the bottom profile without spac-
ers for single glazing (8, 10 and 12 mm) or glazing up to 21 mm.
Position the complete set on sheet support TPG with the stop
shoulder towards the ridge. Add adhesive to the bottom ribbed
zone of bottom profile GVB (or GVT).