E_MH_Instalation_instructions_Skylux_Climax_Panorama
20/11/2020
36/60
Finish
Finish
INSTALLATION OF SCREW-IN TYPE SIDE CLIPS
Drill holes with a Ø of 5.5 mm in the CLSB every 500 mm, starting and ending at 200 mm from the ends.
Fasten the CLSB to the TPG using adapted Hi-Lo screws. Fasten perpendicularly and use a slight torque to ensure the screw head is
pressed flat against the CLSB. Either single screws and/or adaptor profiles CY10/Y25 must be used depending on the glazing thickness
(see the table on page 55).
Cut the CLL / CLSL profile obliquely on the wall side in accordance with the roof pitch a. Measure the distance to the stop profile to
determine the length of profile CLL/CLSL. Position profile CLL/ CLSL on the exterior against the support profile and apply pressure
manually using a rubber hammer and a plank. Fasten the CLL/CLSL every metre sideways against the support (with ZSG) or against
the wall using screws if the structure is to be freestanding or against a wall.
500
200
α
1000
250
ZSG
ZSG
CLL/CLSL