Installation and first operation
6.1 Installation location
•
Adhere to the technical data for operating conditions.
•
Install in a location according to the ambient operating conditions
defined in the section
Ambient Conditions
.
6.2 Inspections prior to first
operation
•
To be performed by a professional electrician
Prior to first operation, a professional electrician must perform and
document the following tests and readings:
•
Visual condition check
•
Function check of operating features and safety features
•
Reading of leakage currents
•
Reading of insulation resistance
Risk of injury and device damage due to incorrect
installation of the optional devices
Therefore:
•
Optional devices, in particular components that are part of a
retrofit, may only be installed in accordance with respective
instructions (circuit diagram).
•
Electromagnetic compability must be tested for the routing,
and appropriate corrective measures carried out if necessary
and as described in the device’s operating manual.
W A R N I N G
!
Note!
Additional information concerning inspections and read-
ings (
†
Maintenance
,
page 43
)
30
www.lmotion.ru
Тел
.: (495)-921-34-60