Introduction
9
851-164336 / D
1.5 Supply conditions
Purpose
The following supply conditions are applicable to standard Simrad
SP70 deliveries and associated optional equipment.
Equipment responsibility
The shipyard performing the installation and/or dealer becomes
fully responsible for the equipment upon receipt unless otherwise
stated in the contract.
The duration of responsibility includes:
•
The period of time the equipment is stored locally before
installation.
•
During the entire installation process.
•
While commissioning the equipment.
•
The period of time between commissioning and the final
acceptance of the equipment by the end user (normally the
owner of the vessel which the equipment has been installed).
The Simrad SP70 system guarantee period (as specified in the
contract) begins when the acceptance documents have been signed
unless other arrangements have been made in the contract.
Receipt, unpacking and storage
Upon accepting shipment of the equipment, the shipyard and/or
the dealer should ensure that the delivery is complete and inspect
each shipping container for evidence of physical damage. If this
inspection reveals any indication of crushing, dropping,
immersion in water or any other form of damage, the recipient
should request that a representative from the company used to
transport the equipment be present during unpacking.
All equipment should be inspected for physical damage, i.e.
broken controls and indicators, dents, scratches etc. during
unpacking.
If any damage to the equipment is discovered, the recipient should
notify both the transportation company and Simrad so that Simrad
can arrange for replacement or repair of the damaged equipment.
Once unpacked, the equipment must be stored in a controlled
environment with an atmosphere free of corrosive agents,
excessive humidity or temperature extremes. The equipment must
be covered to protect it from dust and other forms of contamination
when stored.
→
Refer to page 157 for more information concerning environmental
tolerances.
Summary of Contents for Simrad SP70
Page 2: ......
Page 14: ...Simrad SP70 X 851 164336 D This page is intentionally left blank...
Page 62: ...Simrad SP70 46 851 164336 D Figure 13 Mounting the Transceiver Unit CD3110A...
Page 226: ...Simrad SP70 210 851 164336 D Party Date Signature Party Date Signature Party Date Signature...
Page 227: ......
Page 229: ......