9 START-UP PROCEDURES
9.1 Introduction
The procedures in this chapter shall be carried out once all the
hardware units have been installed, and the cabling is finished.
When you perform the procedures, make sure that you only
perform those tasks described, and in the given order. Also, check
off every item in the procedure as you carry on.
The following procedures shall be performed:
→
Checklist before start-up commences, page 89.
→
Staring the stand-by power supply, page 90.
→
Staring up the Hull Unit, page 92.
→
Adjusting the middle position switch, page 98.
→
Starting the wheelhouse units, page 100.
→
Checking the Operator Panel, page 102.
→
Checking the hoisting and lowering system, page 107.
→
Starting up the Transceiver Unit, page 113.
→
Self-noise test, page 115.
→
System start-up, page 116.
→
Alignment of the sonar picture, page 121.
→
Alignment of the stabilization offset, page 124.
→
Defining own ship parameters, page 127.
Summary of Contents for Simrad SP70
Page 2: ......
Page 14: ...Simrad SP70 X 851 164336 D This page is intentionally left blank...
Page 62: ...Simrad SP70 46 851 164336 D Figure 13 Mounting the Transceiver Unit CD3110A...
Page 226: ...Simrad SP70 210 851 164336 D Party Date Signature Party Date Signature Party Date Signature...
Page 227: ......
Page 229: ......