007-4428-003
19
Chapter 2
2.
Setup and Operation
This chapter describes how to set up and operate your SGI TP900 storage system in the
following sections:
•
“Unpacking and Inspecting the Storage System” on page 19
•
“Connecting the Power Cord” on page 20
•
“Attaching Interface Cables” on page 21
•
“SCSI_ID Addressing” on page 24
•
“Powering On the Enclosure” on page 26
•
“Powering Off the Enclosure” on page 27
•
“Engaging the Anti-tamper Locks” on page 28
Note:
If you use an LSI1030 (LSI22320-R) HBA, you must upgrade the drive firmware
from revision 2741 to revision 2743 in order to have the full benefit of U320 disk drive
speed. The firmware upgrade is normally performed by an SGI service engineer.
Unpacking and Inspecting the Storage System
Remove the storage system from the packaging container and check that all accessories
are included. Inspect the packaging container for evidence of mishandling during transit.
If the packaging container is damaged, photograph it for reference. After removing the
contents, keep the damaged container and the packing materials.
Inspect the storage system and accessories for damage. If the contents appear damaged,
file a damage claim with the carrier immediately. For installations under U.S. auspices,
notify the Customer Support Call Center (CSCC) for any missing, incorrect, or damaged
items. Elsewhere, follow local policies.
Summary of Contents for TP900
Page 1: ...SGI Total Performance 900 Storage System User s Guide 007 4428 003 ...
Page 4: ......
Page 7: ...Contents 007 4428 003 vii Electrostatic Discharge 54 Electromagnetic Emissions 54 Index 55 ...
Page 8: ......
Page 12: ......
Page 16: ......
Page 46: ......
Page 66: ......