8.2
Switching on the machine
1. If at all possible, run the machine without load and check that it is running smoothly.
2. If it runs perfectly, connect a load.
NOTICE
Thermal overload of motors connected directly to the line supply
In addition to the load torque, the ramp-up (accelerating) time is essentially influenced by
the moment of inertia to be accelerated. While ramping up when connected to the line
supply, the inrush (starting) current is a multiple of the rated current. This can result in
thermal overload. This can damage the motor.
As a consequence, when ramping up, observe the following:
● Monitor the ramp-up time and number of consecutive starts.
● Comply with the limit values and/or ramp-up conditions specified in the catalog or the
order documentation.
3. If this is possible using the available measuring equipment, check the bearing and stator
winding temperatures.
8.3
Regreasing roller bearings
Refer to the regreasing instructions for the roller bearings on the lubricant plate.
8.4
Stoppages
The stoppage is a shutdown for a period of time, during which the machine is stopped but
remains at the location of use.
Under normal ambient conditions, e. g. the stopped machine is not exposed to any vibration, no
increased level of corrosion, etc. in general, the following measures are necessary during
stoppages.
NOTICE
Damage due to improper storage
Damage may occur to the motor if it is not stored properly.
If the machine is to be taken out of operation for more than 12 months, suitable anti-corrosion,
preservation, packaging, and drying measures must be taken.
See also
Transport (Page 40)
Start-up (Page 97)
Operation
8.2 Switching on the machine
SIMOTICS FD 1LH1
Operating Instructions 01/2019
113
Summary of Contents for SIMOTICS FD 1LH1
Page 2: ...23 01 2019 19 26 V11 01 ...
Page 28: ...Description SIMOTICS FD 1LH1 28 Operating Instructions 01 2019 ...
Page 122: ...Operation 8 10 faults SIMOTICS FD 1LH1 122 Operating Instructions 01 2019 ...
Page 140: ...Maintenance 9 2 Corrective Maintenance SIMOTICS FD 1LH1 140 Operating Instructions 01 2019 ...
Page 162: ...Disposal 11 5 Disposal of components SIMOTICS FD 1LH1 162 Operating Instructions 01 2019 ...
Page 164: ...Service and Support SIMOTICS FD 1LH1 164 Operating Instructions 01 2019 ...
Page 168: ...Quality documents SIMOTICS FD 1LH1 168 Operating Instructions 01 2019 ...
Page 173: ......