
Allow the condensation water to discharge for horizontal placement
The water drain holes are located in the lower side of the stator enclosure, and sealed with
screw plugs.
Figure 5-3
Condensation water drain for horizontal mounting
To drain the condensation water, proceed as follows:
1. Remove the screw plugs to allow the condensation water to drain.
2. Then reinsert the screw plugs.
NOTICE
The degree of protection is reduced
Nominally the degree of protection of the machine is reduced to IP44 when the screw plug is
removed.
5.3.10
Roughly aligning the machine
Requirement
The transmission element such as a coupling half has already been pulled on.
Roughly aligning the machine
● For horizontal positioning, push the motor sideways across the foundation. When doing so,
ensure that the axial position is maintained.
Assembly
5.3 Lift the machine to where it will be installed, and position it
SIMOTICS FD 1LH1
Operating Instructions 01/2019
65
Summary of Contents for SIMOTICS FD 1LH1
Page 2: ...23 01 2019 19 26 V11 01 ...
Page 28: ...Description SIMOTICS FD 1LH1 28 Operating Instructions 01 2019 ...
Page 122: ...Operation 8 10 faults SIMOTICS FD 1LH1 122 Operating Instructions 01 2019 ...
Page 140: ...Maintenance 9 2 Corrective Maintenance SIMOTICS FD 1LH1 140 Operating Instructions 01 2019 ...
Page 162: ...Disposal 11 5 Disposal of components SIMOTICS FD 1LH1 162 Operating Instructions 01 2019 ...
Page 164: ...Service and Support SIMOTICS FD 1LH1 164 Operating Instructions 01 2019 ...
Page 168: ...Quality documents SIMOTICS FD 1LH1 168 Operating Instructions 01 2019 ...
Page 173: ......